A Filipino Engineer, Registered Professional Engineer of Queensland (RPEQ) - Australia, and Professional Electrical Engineer (PEE - 1st Place April 1991) - Philippines with extensive experience in concept selection, front-end engineering, HV & LV detail design, construction, and commissioning of Hazardous and Non-Hazardous Area electrical installations in water and wastewater pipeline and pumping facilities, offshore platforms, hydrocarbon process plants and pipelines including related facilities. Hazardous area classification and design certification (UEENEEM015B, UEENEEM016B, UEENEEM017B).
The PEC has defined a Separately Derived System as an electrical source, other than a service, having no direct connection(s) to circuit conductors of any other electrical source other than …
Additional GFCI Requirements The PEC has more requirements for GFCI than that in the kitchen. Below are sections of the Philippine Electrical Code 2017 Part 1 but not limited to …
This is a series of articles where we shall be discussion the common violation on the Philippine Electrical Code. It is the assumption of this series of article that the …
Arc-flash analysis is required by the Philippine Electrical Code (PEC) to enhance safety for workers who may be exposed to electrical hazards. PEC mandates arc-flash analysis requirements under Section 1.3.2.1(F) …
This is a series of articles where we shall be discussion the common violation on the Philippine Electrical Code. It is the assumption of this series of article that the …
This is a series of articles where we shall be discussion the common violation on the Philippine Electrical Code. It is the assumption of this series of article that the …