Sign-off on a Marked-up Document

In brownfield projects, particularly those facilities which are more than three (3) decades old, the availability of native CAD file drawings is almost nil. Redrafting the facility drawing is not …

Importance of Project Design Stages

Successful projects, particularly big-budget ones, were not developed overnight. These projects have undergone several stages. Missing any one stage may cause disastrous effects on the projects leading to project delivery …

Design Uniformity Simplifies Replication

Design Stage In multi-site projects, almost always, the first site requires the most engineering hours. Getting the right design and configuration on the first site will simplify replication process which …

Power Line

Electrical Power System Studies

Power system studies vary significantly In each design process depending on the purpose of the project. It would be better to have a complete study on your project rather than …

IEC 60038 – Voltage Standardization

IEC 60038-1983, amended in 1994 and 1997 (current revision IEC 60038:2009/AMD1:2021) is a directive to standardize voltages of a.c. transmission, distribution, and utilization systems and equipment for use in such …