The Concept Selection stage is not a FEED stage. Looking at the right perspective, Concept Selection […]
The NEC and PEC define and identify grounded conductor and grounding conductor differently. To understand better, […]
If you have been working with IEC standards or its derivative standards like the AS, it […]
Cable shields and the metallic sheath or armor need to be solidly grounded on at least […]