A Filipino Engineer, Registered Professional Engineer of Queensland (RPEQ) - Australia, and Professional Electrical Engineer (PEE - 1st Place April 1991) - Philippines with extensive experience in concept selection, front-end engineering, HV & LV detail design, construction, and commissioning of Hazardous and Non-Hazardous Area electrical installations in water and wastewater pipeline and pumping facilities, offshore platforms, hydrocarbon process plants and pipelines including related facilities. Hazardous area classification and design certification (UEENEEM015B, UEENEEM016B, UEENEEM017B).
When doing power systems study, it always the predicament of Electrical Engineers where to get the values of the utility short circuit MVA. I was just talking to a senior …
Oil-immersed transformer cooling methods are consistent in both the IEC and IEEE. This designation is one of the few that is the same for both standards. Oil-immersed transformer cooling method …
Short-circuit calculation is one of the most important work to be undertaken in plant power distribution. A comprehensive, detailed and accurate short-circuit currents will be used in switchgear selection, protection …
Important Note: Open circuit faults are presented in this article. Calculating three-phase faults is very straightforward. Unbalance faults, however, have a little bit of challenge in it as it requires …
Important: Please note that any materials presented herein is subject to the conditions of the disclaimer of this site. I am receiving a significant number of enquiries on how to …