Extending Equipment Service Life
In critical operations, extended plant shutdown is not acceptable unless it is a turnaround. A turnaround (TAR) is a scheduled event wherein an entire process unit of an industrial plant …
In critical operations, extended plant shutdown is not acceptable unless it is a turnaround. A turnaround (TAR) is a scheduled event wherein an entire process unit of an industrial plant …
There are times that the Electrical Engineer are unable to get the utility fault level data to calculate the required electrical parameters for a project. In such case, it is …
Important: Please note that any materials presented herein is subject to the conditions of the disclaimer of this site. I am receiving a significant number of enquiries on how to …
Practically, all engineering design problems require three (3) elements to come up with a complete solution. 1. Measurable Elements. These elements can be determined with exactness. Example – material costs, …
The sizes of earth conductors and earth electrodes are almost always chosen from typical sizes as provided by a particular project standard. If using non-typical sizes can extensively impact the …
Part 1 Part 2 Part 4 Code of Practice on Energy Labelling of Products (COPE) COPE refers to the particular product requirement which is an integral part of the guidelines …