A Filipino Engineer, Registered Professional Engineer of Queensland (RPEQ) - Australia, and Professional Electrical Engineer (PEE - 1st Place April 1991) - Philippines with extensive experience in concept selection, front-end engineering, HV & LV detail design, construction, and commissioning of Hazardous and Non-Hazardous Area electrical installations in water and wastewater pipeline and pumping facilities, offshore platforms, hydrocarbon process plants and pipelines including related facilities. Hazardous area classification and design certification (UEENEEM015B, UEENEEM016B, UEENEEM017B).
Note: This is the first part of a series of articles in the estimation of pant electrical loads. In the design of a plant power system, one of the early …
As an Electrical Engineer working on a global scope, knowledge on International Electrical Standards such as the IEC and the IEEE is an advantage. This is just the start though, …
In this article, I have presented the effects of utility fault level on low voltage equipment. Assuming an infinite bus as the utility fault level will have a significant cost …
There are times that the Electrical Engineer are unable to get the utility fault level data to calculate the required electrical parameters for a project. In such case, it is …
Even simple projects could be complicated if not properly planned. Inability to respond to site conditions will make conditions even worse as safety will be compromised in all aspects. Some …
It is of utmost importance that an induction motor selected for a particular application to have sufficient power and torque to be able to function properly and efficiently. Starting high …