The Significance of Low Voltage Ride-Through (LVRT) in Variable Renewable Energy Systems

As the global energy landscape transitions toward renewable sources, maintaining grid stability while integrating variable renewable energy (VRE) systems—such as solar photovoltaics (PV) and wind turbines—has become increasingly important. One essential feature that ensures the resilience of these systems during disturbances is Low Voltage Ride-Through (LVRT) capability.

What is LVRT?

Low Voltage Ride-Through (LVRT) refers to the ability of a power generating unit to stay connected to the grid during short-term voltage sags caused by faults or other disturbances. Rather than disconnecting from the grid, a VRE system with LVRT continues to operate and helps support voltage recovery.

Why is LVRT Important?

1. Prevents Mass Disconnection

During faults, significant voltage dips can cause large numbers of generators to disconnect if not equipped with LVRT. This simultaneous disconnection can severely destabilize the grid and potentially lead to widespread blackouts.

2. Supports Grid Recovery

Generators with LVRT capabilities can inject reactive power during faults, aiding voltage recovery and enabling the grid to return to a stable operating condition more quickly.

3. Regulatory Compliance

Most grid operators around the world now mandate LVRT as a precondition for interconnecting renewable energy systems. Compliance with these grid codes ensures system reliability and market participation.

4. Facilitates High Renewable Penetration

Without LVRT, utilities would limit the amount of VRE that can be connected to the grid. Implementing LVRT capabilities allows higher levels of renewable integration while maintaining system security.

International Standards and Grid Code Requirements

To ensure consistent LVRT performance, various national and international standards define minimum capabilities for different generator types:

See also  Evaluation of Ni-Cd Batteries in Photovoltaic Systems
Region / Body Standard / Grid Code LVRT Requirements
IEC IEC 61400-21 (Wind), IEC 62817 (PV) Performance metrics under voltage disturbance conditions
USA (NERC) NERC PRC-024-2 Specifies voltage/time curves for ride-through behavior
Europe (ENTSO-E) EU RfG Requires LVRT for Type C and D generation units
India (CEA) CEA Grid Code VRE must remain connected during voltage dips of specified severity
Australia (AEMO) Generator Performance Standards Inverters must ride through faults and support the grid
China GB/T 19964 (PV systems) National technical specification for LVRT in PV systems

How to Achieve LVRT in VRE Systems

Achieving LVRT compliance requires a combination of hardware design, inverter control algorithms, and protection coordination. Key methods include:

1. Advanced Inverter Control

  • Fast fault detection via DSPs or microcontrollers.

  • Reactive current injection to stabilize voltage during faults.

  • PLL decoupling to maintain synchronization even under distorted voltages.

2. DC-Link Voltage Management

During a fault, the inverter’s power output path may be blocked, causing DC-link voltage to rise. Solutions include:

  • Energy storage integration

  • Dynamic braking resistors

  • Crowbar circuits

3. Grid-Side Support Devices

Devices like STATCOMs or SVCs can provide additional reactive support to help meet LVRT requirements in weak grid scenarios.

4. Protection System Coordination

Protection relays must be set to allow inverters to remain online during the duration of the voltage sag as specified by the grid code. This involves:

  • Adjusting undervoltage, overcurrent, and anti-islanding settings.

  • Using ride-through curves from grid code standards to set relay thresholds.

5. Testing and Certification

Type-testing using voltage sag simulators and grid simulators is essential to demonstrate compliance with LVRT requirements. Certified testing laboratories typically verify performance against IEC or national grid standards.

See also  Ground-fault Protection for Personnel In Dwelling Units In Accordance to Philippine Electrical Code 2017 Edition

Conclusion

As VRE penetration continues to grow worldwide, LVRT is no longer optional—it is essential. It ensures that renewable energy sources can contribute to grid stability rather than compromise it during transient events. By complying with international standards and employing robust inverter controls, energy developers and operators can ensure the seamless, resilient integration of renewables into modern power systems.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.