Industrial Plant Design/System Planning/Determination of Loads
Determination of Loads
While the authors have used good faith and efforts to ensure that the information and instructions contained in this work are accurate, the authors disclaim all responsibility for errors or omissions, including without limitation responsibility for damages resulting from the use of or reliance on this work. Use of the information and instructions contained in this work is at your own risk. If any contents or other technology this work contains or describes is subject to open source licenses or the intellectual property rights of others, it is your responsibility to ensure that your use thereof complies with such licenses and/or rights.
Note: This is a work in progress...
General
Determination of the load is the Electrical Engineer's first problem and may be difficult to solve. The size and number of primary and secondary substations, the size, number, and arrangement of primary feeders, and the type of secondary distribution are largely
dependent on the amount and nature of the load and its distribution.
The plant distribution system usually must be designed before all loads are known. This is at a time when the equipment layout itself is only in the formative stage. Equipment may be bought piecemeal during which time changes in machines are taking place either in number or size. Ideas are changed by the impact of what is commercially available, or by manufacturers’ recommendations for improved models, better ways of securing a given result, or by competitive conditions. Processes themselves are being changed as available equipment is fitted into the prospective production schedule.