Philippine Electrical Code 2017 Part 1/Chapter 1. General/Article 1.2 - Permits And Inspection Certificates

From Filipino Engineer Wiki

Article 1.2 - Permits And Inspection Certificates

DISCLAIMER
This is not an official copy of the Philippine Electrical Code. This is a Design Guide according to the provisions of the Philippine Electrical Code. It also provides interpretation and annotations of the clauses of the Philippine Electrical Code. Any information, interpretation and/or annotation presented herein are based on personal opinion of the authors and does not represent the official interpretation of the Philippine Electrical Code.


While the authors have used good faith and efforts to ensure that the information and instructions contained in this work are accurate, the authors disclaim all responsibility for errors or omissions, including without limitation responsibility for damages resulting from the use of or reliance on this work. Use of the information and instructions contained in this work is at your own risk. If any contents or other technology this work contains or describes is subject to open source licenses or the intellectual property rights of others, it is your responsibility to ensure that your use thereof complies with such licenses and/or rights.

Note: This is a work in progress...

1.2.1 Electrical Permits

1.2.1.1 Electrical Permit Needed Before Work is Started.

Before starting any installation work, alteration, repair or extension on any electrical system, the owners, lessors, operators, occupants, or licensed electrical practitioners shall obtain Electrical Permit for buildings, trailers, mobile homes, or other premises from the Office of the Building Official (OBO), and for watercrafts from the authority for maritime concerns. In securing the electrical permit, the services of a licensed electrical practitioner is required under the Republic Act 7920[1] or national electrical engineering law.

It is explicitly stated in this clause of the Philippine Electrical Code that the services of a Licensed Electrical Practitioner is required. RA 7920[1] Sec. 31. Field of Practice states the field of practice for professional electrical engineers, registered electrical engineers, and registered master electricians.


1.2.1.2 Requirement for Electrical Permit: Signatures and submittals.

(A) The Electrical Permit shall include the following minimum information:

1. Applicant.
2. Professional Electrical Engineer who signed and sealed electrical plans and specifications, with a photocopy of valid Professional Tax Receipt (PTR) and valid Professional Regulation Commission (PRC) License.
3. 3. Licensed Electrical Practitioner who is in-charge of electrical works, with a photocopy of valid PTR and valid PRC License.
4. Building Owner.
5. Lot Owner.
6. Building Official

(B) Five (5) sets of complete electrical plans and specifications signed and sealed by Professional Electrical Engineer.

1.2.1.3 Electrical Permit to Be Issued Immediately.

(A) The application, upon receipt, shall be checked immediately by the electrical engineer of the local building official or his representatives for compliance with the requirements. If complying, the Electrical Permits shall be issued upon payment of the corresponding electrical fees.

(B) If the project is extensive and requires more time for checking of the routinary fiscal and ministerial requirements, the issuance of the Electrical Permit need not be issued immediately. The delay shall not be longer than five (5) working days after which time application together with the accompanying plans shall be considered as complying with all the requirements and the electrical permit shall be issued immediately thereafter.

With this provision of PEC1, if more than five (5) working days have elapsed, the applicant has the right to demand approval of application and release of the Electrical Permit.

1.2.1.4 Posting of Electrical Permit.

A copy of the Electrical Permit, upon issuance, shall be posted at a conspicuous location at the job site and shall not be removed until final inspection and approval of the work shall have been made.

Licensed Electrical Practitioner in-charge of the design, and the licensed electrical practitioner in-charge of the installation shall post a copy of their respective Professional Regulation Commission (PRC)[2] identification card together with the electrical permit at all times.

1.2.2 Electrical Inspection

1.2.2.1 Application for Inspection.

An application for inspection shall be filed with the Office of the Building Official (OBO) before a preliminary and/or final inspection is done.

1.2.2.2 Certificate of Inspection.

No electrical installation, alteration. and/or addition shall be connected or reconnected to any power supply or any other source of electrical energy without a Certificate of Final Electrical Inspection/Completion obtained from the Office of the Building Official (OBO) signed by the office of the Building Official/EE (OBO/EE).

Exception: A temporary Certificate of Inspection may be signed by the Office of the Building Official/EE (OBO/ EFM) for the purpose of testing and commissioning the installed equipment within the premises. Validity date shall he indicated in such certificate.

1.2.3 Special

1.2.3.1 Temporary Installation.

For temporary electrical installation, the same procedure as stated above shall be followed. At the end of the period covered by the certificate of inspection, the temporary installation shall be removed. Extended use of the temporary installation shall require an extension or approval electrical permit from the Office of the Building Official (OBO) signed by the Office of the Building Official/EE (OBO/EE) .

1.2.3.3 Special Permission Required.

Electrical equipment and wiring not specifically covered or mentioned in the various articles of this Code shall require special permission and written approval of a licensed electrical practitioner under the enforcing government authority concerned, prior to installation.

1.2.3.4 Reconnection of Disconnected Services.

In cases where service has been cut off for more than one (1) year, a new certificate of final electrical inspection shall be required before reconnection.

Other Pages in this Category: Chapter 1. General

<DynamicPageList> category = Philippine Electrical Code 2017 Part 1/Chapter 1. General count = 5 order = ascending addfirstcategorydate = false </DynamicPageList>

References